Duration: 90-120 Minutes
Introduces trainees to the hazards they must be aware of when visiting or working at an LNG facility. Explains the safety measures in place for mitigating these hazards. Examines both the company’s role and the individual’s role in ensuring the safety measures in place are reliable in reducing risk.
Duration: 45-60 Minutes
Provides an overview of the major process systems of an LNG liquefaction facility. Covers the design parameters process engineers must follow when designing an LNG plant.
Duration: 30-45 Minutes
Describes the basic terminology in thermodynamics and how they relate to the LNG liquefaction process. Explains the thermodynamic concepts that are associated with the LNG refrigeration processes.
Duration: 30-45 Minutes
Outlines the evolution of LNG technology. Describes the main processes in the liquefaction and refrigeration systems. Details the different types of LNG technology available today.
Duration: 30-45 Minutes
Examines the importance of safe working practices and how they relate to operational risk. Details the role that safety critical elements, risk matrices, and procedures play in safe operations.
Duration: 20-30 Minutes
Explains the purpose of propane refrigeration and the main components in the system. Details the role of a propane compressor and the importance of compressor surge.
Duration: 30-45 Minutes
Introduces the concept of condensate stabilization and the role it plays in gas-liquid separation. Details the internal components of a condensate stabilizer and explains the process to remove liquid from the LNG facility feed gas.
Duration: 40-60 Minutes
Describes the purpose of the acid gas removal system and lists the specifications required for acid gas removal. Explains the subsystems within the acid gas removal system and describes the major pieces of equipment. Details the major operational issues that can occur during removal of acid gas in the liquefaction process
Duration: 20-30 Minutes
Explains the purpose of the H2S removal system and the main equipment in the system. Describes a typical arrangement of the equipment and the potential operational issues that can occur. Details the alternative H2S removal systems available.
Duration: 30-45 Minutes
Describes the purpose of the dehydration system and the importance of removing moisture from the feed gas. Lists the common operating parameters of the dehydration system and details the internal components of the major pieces of equipment.